1 x research source this is a great way to maximize your living space and with a lot of patience and a little bit of know how it is a home improvement goal that you can accomplish for yourself.
Framing a pocket door new construction.
Before you start framing a wall to accept a pocket door you ll need to choose a pocket door frame.
Remove the door and then install drywall over the door pocket using construction adhesive and 1 inch drywall screws.
Once the wall.
This is where the frame header brackets will rest.
Each manufacturer is slightly different so it s best to look up the specification or buy the frame before you frame the wall.
Finish the joints with drywall tape and several coats of drywall compound.
This makes a room more versatile since it can be closed off from the rest of the house when necessary.
Be sure to screw the brackets into the studs.
Framing a pocket door refers to the first stage of installing a concealed door.
The rough opening for one of their pocket door frames is two times the door width plus an inch 2 door width 1 inch for the width and 5 inches plus the door height for the header height.
Reinstall the door and then install the door guides on the inside and outside of the door at the mouth of the pocket.
Mount the split stud at a distance equal to the width of the door plus 3 4 inch from the trimmer framing the door opening.
The extra 3 4 inch allows for a jamb on the side of the door opposite the.
Plumb both jambs with the door.
Use a stud finder to locate and mark the stud locations then hammer a nail on the center leaving roughly 1 8 inch sticking out.
Remember to keep a minimum of 3 16 clearance between the jamb and the door.
To install a pocket door start by removing the existing door and the drywall on one side of the wall.
Next install the slider track using the rails that came in your pocket door kit.
Glue and screw together the 2 by 4s to build a pony wall a smaller non load bearing wall for hanging the track for the pocket doors.
Then put the hardware and door into the slider track.
Then cut the exposed studs to make room for the new framing.
Install the pocket door frame measure up from the floor 80 inches leaving anywhere from inches to 1 inches clearance under the door.
Make sure the frame is level.